commerce logo
commerce logo
Commerce Home | State of MN Home
Monday, July 04, 2022
Minnesota Commerce: eFiling
Commerce
Banking & Finance
Energy
Insurance
Weights & Measures
 

eFiling - File electronically with the Public Utilities Commission and the Department of Commerce.

eFiling

eFiling Home/Login

Request Registration

Forgot Password

eService

eService Home/Login

Manage My Subscriptions

eDockets Search

eDockets Home

eDockets - Search Documents

Help/Links

 eDockets Search Help

 eFiling Help

 eService Help

 Links



   Search Results
  
   Search Criteria - Search Returned 172 Results (If the search returned over 500 results, the results will be split into multiple pages. Each page is limited to 500 results. Please include as many search criteria as possible. For example, use "Received Date Range" in addition to a docket year and docket number.)

If search results contain more than 1 page, then the results for each page must be exported separately.
  
  
  
  • Docket Number: 22-10
  • Results per Page: All
  •   
      
       To view the document, click the link in the document ID column. Trade secret documents are not viewable for unauthorized users.
    Click the column heading to sort the results.
     
    New Search           Modify Search          
     
    Page of 1

    Showing 1 to 172 of 172 results

    Document ID Class Docket # Subscribe Docket Type On Behalf Of Document Type Received Date
    20224-184818-02 PUBLIC 22-10 PR XCEL ENERGY OTHER--ERRATA¿ ANNUAL DISTRIBUTED GENERATION INTERCONNECTIONS 04/15/2022
    20224-184818-04 PUBLIC 22-10 PR XCEL ENERGY OTHER--ERRATA¿ ANNUAL DISTRIBUTED GENERATION INTERCONNECTIONS 04/15/2022
    20224-184818-06 TRADE SECRET 22-10 PR XCEL ENERGY OTHER--ERRATA¿ ANNUAL DISTRIBUTED GENERATION INTERCONNECTIONS 04/15/2022
    20223-183955-01 TRADE SECRET 22-10 PR CONNEXUS ENERGY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/18/2022
    20223-183955-02 PUBLIC 22-10 PR CONNEXUS ENERGY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/18/2022
    20223-183857-01 PUBLIC 22-10 PR MINNESOTA POWER REPORT--GENERATION INTERCONNECTION REPORT 03/16/2022
    20223-183857-02 TRADE SECRET 22-10 PR MINNESOTA POWER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/16/2022
    20223-183739-01 PUBLIC 22-10 PR CITY OF NIELSVILLE REPORT--ANNUAL DISTRIBUTED GENERATION 03/13/2022
    20223-183646-01 PUBLIC 22-10 PR CITY OF MABEL REPORT--ANNUAL DISTRIBUTED GENERATION 03/10/2022
    20223-183653-01 PUBLIC 22-10 PR IOWA LAKES ELECTRIC COOPERATIVE REPORT--ANNUAL DISTRIBUTED GENERATION 03/10/2022
    20223-183659-01 PUBLIC 22-10 PR CITY OF TWO HARBORS REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/10/2022
    20223-183608-01 PUBLIC 22-10 PR CITY OF ORTONVILLE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/09/2022
    20223-183613-01 PUBLIC 22-10 PR BLOOMING PRAIRIE PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/09/2022
    20223-183625-01 PUBLIC 22-10 PR ROSEAU ELECTRIC COOPERATIVE REPORT--DER INTERCONNECTION REPORT 03/09/2022
    20223-183631-01 PUBLIC 22-10 PR CITY OF ANOKA REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/09/2022
    20223-183532-01 PUBLIC 22-10 PR CITY OF TYLER REPORT--ANNUAL DISTRIBUTED GENERATION 03/08/2022
    20223-183540-01 PUBLIC 22-10 PR LANESBORO PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/08/2022
    20223-183547-01 PUBLIC 22-10 PR CITY OF CEYLON REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/08/2022
    20223-183548-01 PUBLIC 22-10 PR CITY OF MOUNTAIN IRON REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/08/2022
    20223-183560-01 PUBLIC 22-10 PR WORTHINGTON PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/08/2022
    20223-183562-01 PUBLIC 22-10 PR CITY OF HARMONY REPORT--ANNUAL DISTRIBUTED GENERATION 03/08/2022
    20223-183563-01 PUBLIC 22-10 PR KENYON MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/08/2022
    20223-183587-01 PUBLIC 22-10 PR CITY OF PETERSON REPORT--ANNUAL DISTRIBUTED GENERATION 03/08/2022
    20223-183595-01 PUBLIC 22-10 PR SIOUX VALLEY ENERGY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/08/2022
    20223-183515-01 PUBLIC 22-10 PR CITY OF ST.JAMES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/07/2022
    20223-183366-01 PUBLIC 22-10 PR LITCHFIELD PUBLIC UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 03/02/2022
    20223-183373-01 PUBLIC 22-10 PR CITY OF SHELLY REPORT--ANNUAL DISTRIBUTED GENERATION 03/02/2022
    20223-183374-01 PUBLIC 22-10 PR BROWN COUNTY RURAL ELECTRICAL ASSN. REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/02/2022
    20222-183277-01 PUBLIC 22-10 PR MEEKER COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/01/2022
    20222-183278-01 PUBLIC 22-10 PR WARROAD MUNICIPAL LIGHT & POWER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/01/2022
    20222-183279-01 PUBLIC 22-10 PR THIEF RIVER FALLS POWER AND LIGHT REPORT--ANNUAL DISTRIBUTED GENERATION 03/01/2022
    20222-183280-01 PUBLIC 22-10 PR ST. CHARLES LIGHT AND WATER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/01/2022
    20222-183281-01 PUBLIC 22-10 PR SLEEPY EYE PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/01/2022
    20222-183282-01 PUBLIC 22-10 PR NORTH ITASCA ELECTRIC COOPERATIVE INC REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/01/2022
    20223-183290-01 PUBLIC 22-10 PR CITY OF ELY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/01/2022
    20223-183313-01 PUBLIC 22-10 PR STEELE-WASECA COOPERATIVE ELECTRIC REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 03/01/2022
    20223-183334-01 PUBLIC 22-10 PR CITY OF KEEWATIN-PUBLIC UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 03/01/2022
    20223-183335-01 PUBLIC 22-10 PR XCEL ENERGY REPORT--DISTRIBUTED GENERATION INTERCONNECTIONS - ANNUAL REPORT 03/01/2022
    20223-183335-03 TRADE SECRET 22-10 PR XCEL ENERGY REPORT--DISTRIBUTED GENERATION INTERCONNECTIONS - ANNUAL REPORT 03/01/2022
    20223-183335-05 PUBLIC 22-10 PR XCEL ENERGY REPORT--DISTRIBUTED GENERATION INTERCONNECTIONS - ANNUAL REPORT - ATTACHMENT A EXCEL FILE 03/01/2022
    20223-183335-07 TRADE SECRET 22-10 PR XCEL ENERGY REPORT--DISTRIBUTED GENERATION INTERCONNECTIONS - ANNUAL REPORT - ATTACHMENT A EXCEL FILE 03/01/2022
    20222-183226-01 PUBLIC 22-10 PR OWATONNA PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/28/2022
    20222-183232-01 PUBLIC 22-10 PR STEELE-WASECA COOPERATIVE ELECTRIC REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT 02/28/2022
    20222-183233-01 PUBLIC 22-10 PR CITY OF NORTH SAINT PAUL REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/28/2022
    20222-183236-01 PUBLIC 22-10 PR MELROSE PUBLIC UTILITY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/28/2022
    20222-183251-01 PUBLIC 22-10 PR DAKOTA ELECTRIC ASSOCIATION REPORT--DISTRIBUTED ENERGY RESOURCE DER INTERCONNECTION REPORT 02/28/2022
    20222-183259-01 PUBLIC 22-10 PR PKM ELECTRIC COOPERATIVE, INC. REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/28/2022
    20222-183262-01 PUBLIC 22-10 PR OTTER TAIL POWER COMPANY REPORT--DISTRIBUTED GENERATION INFORMATION REPORT 02/28/2022
    20222-183262-02 PUBLIC 22-10 PR OTTER TAIL POWER COMPANY REPORT--DISTRIBUTED GENERATION INFORMATION REPORT 02/28/2022
    20222-183264-01 PUBLIC 22-10 PR CITY OF KASSON REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/28/2022
    20222-183267-01 PUBLIC 22-10 PR CITY OF LAKE CITY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/28/2022
    20222-183271-01 PUBLIC 22-10 PR MINNESOTA POWER REPORT--GENERATION INTERCONNECTION REPORT 02/28/2022
    20222-183271-02 TRADE SECRET 22-10 PR MINNESOTA POWER REPORT--GENERATION INTERCONNECTION REPORT 02/28/2022
    20222-183273-01 PUBLIC 22-10 PR CITY OF GILBERT REPORT--ANNUAL DISTRIBUTED GENERATION 02/28/2022
    20222-183178-01 PUBLIC 22-10 PR WILLMAR MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/25/2022
    20222-183209-01 PUBLIC 22-10 PR VIRGINIA PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/25/2022
    20222-183115-01 PUBLIC 22-10 PR LAKE PARK PUBLIC UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 02/24/2022
    20222-183124-01 PUBLIC 22-10 PR BRAINERD PUBLIC UTILITIES REPORT--REVISED DER INTERCONNECTION REPORT 02/24/2022
    20222-183127-01 PUBLIC 22-10 PR BAGLEY PUBLIC UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 02/24/2022
    20222-183128-01 PUBLIC 22-10 PR CITY OF GRANITE FALLS REPORT--DER INTERCONNECTION REPORT 02/24/2022
    20222-183069-01 PUBLIC 22-10 PR LE SUEUR MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/23/2022
    20222-183073-01 PUBLIC 22-10 PR MINNESOTA VALLEY ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/23/2022
    20222-183097-01 PUBLIC 22-10 PR GROVE CITY ELECTRIC REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/23/2022
    20222-183100-01 PUBLIC 22-10 PR FAIRMONT PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/23/2022
    20222-183102-01 PUBLIC 22-10 PR ST. CHARLES LIGHT AND WATER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/23/2022
    20222-183105-01 PUBLIC 22-10 PR GRAND RAPIDS PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/23/2022
    20222-182990-01 PUBLIC 22-10 PR LAKE COUNTRY POWER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/22/2022
    20222-182996-01 PUBLIC 22-10 PR BELTRAMI ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/22/2022
    20222-182998-01 PUBLIC 22-10 PR EAST CENTRAL ENERGY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/22/2022
    20222-183005-01 PUBLIC 22-10 PR MOUNTAIN LAKE MUNICIPAL UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 02/22/2022
    20222-183007-01 PUBLIC 22-10 PR CITY OF WADENA REPORT--ANNUAL DISTRIBUTED GENERATION 02/22/2022
    20222-183017-01 PUBLIC 22-10 PR H-D ELECTRIC COOPERATIVE, INC. REPORT--ANNUAL DISTRIBUTED GENERATION 02/22/2022
    20222-183034-01 PUBLIC 22-10 PR ADRIAN PUBLIC UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 02/22/2022
    20222-183040-01 PUBLIC 22-10 PR HEARTLAND POWER COOPERTIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/22/2022
    20222-183045-01 PUBLIC 22-10 PR ROCHESTER PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/22/2022
    20222-183058-01 PUBLIC 22-10 PR NORTH BRANCH MUNICIPAL WATER AND LIGHT REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/22/2022
    20222-183061-01 PUBLIC 22-10 PR CITY OF LUVERNE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/22/2022
    20222-182935-01 PUBLIC 22-10 PR CITY OF ADA INITIAL FILING 02/18/2022
    20222-182937-01 PUBLIC 22-10 PR PEOPLE'S ENERGY COOPERATIVE COMPLIANCE FILING 02/18/2022
    20222-182949-01 PUBLIC 22-10 PR MIENERGY COOPERATIVE REPORT 02/18/2022
    20222-182965-01 PUBLIC 22-10 PR MARSHALLMUNICIPAL UTILITIES REPORT 02/18/2022
    20222-182977-01 PUBLIC 22-10 PR MOORHEAD PUBLIC SERVICE REPORT 02/18/2022
    20222-182860-01 PUBLIC 22-10 PR CITY OF FOSSTON REPORT--DISTRIBUTION ENERGY RESOURCE INTERCONNECTION REPORT 02/16/2022
    20222-182861-01 PUBLIC 22-10 PR CITY OF STEPHEN UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 02/16/2022
    20222-182863-01 PUBLIC 22-10 PR CITY OF WARREN WATER AND LIGHT REPORT--DER INTERCONNECTION REPORT 02/16/2022
    20222-182866-01 PUBLIC 22-10 PR HAWLEY PUBLIC UTILITIES REPORT--DER INTERCONNECTION REPORT 02/16/2022
    20222-182867-01 PUBLIC 22-10 PR RED LAKE ELECTRIC COOPERATIVE, INC. REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/16/2022
    20222-182789-01 PUBLIC 22-10 PR CITY OF DUNDEE REPORT--ANNUAL DISTRIBUTED GENERATION 02/15/2022
    20222-182792-01 PUBLIC 22-10 PR CITY OF DUNDEE REPORT--ANNUAL DISTRIBUTED GENERATION 02/15/2022
    20222-182794-01 PUBLIC 22-10 PR CITY OF DUNDEE REPORT--ANNUAL DISTRIBUTED GENERATION 02/15/2022
    20222-182810-01 PUBLIC 22-10 PR LAKEFIELD PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/15/2022
    20222-182810-02 TRADE SECRET 22-10 PR LAKEFIELD PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/15/2022
    20222-182816-01 PUBLIC 22-10 PR TRAVERSE ELECTRIC COOPERATIVE REPORT--DER INTERCONNECTION REPORT 02/15/2022
    20222-182819-01 PUBLIC 22-10 PR CITY OF BRECKENRIDGE REPORT--ANNUAL DISTRIBUTED GENERATION 02/15/2022
    20222-182830-01 PUBLIC 22-10 PR SAUK CENTRE PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/15/2022
    20222-182845-01 PUBLIC 22-10 PR CITY OF BAUDETTE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/15/2022
    20222-182846-01 PUBLIC 22-10 PR CITY OF ARLINGTON REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/15/2022
    20222-182736-02 PUBLIC 22-10 PR MADISON MUNICIPAL UTILITIES REPORT--QUALIFYING FACILITIES REPORT 02/14/2022
    20222-182736-04 PUBLIC 22-10 PR MADISON MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/14/2022
    20222-182743-01 PUBLIC 22-10 PR PRESTON PUBLIC UTILITIES REPORT 02/14/2022
    20222-182747-01 PUBLIC 22-10 PR CITY OF ROUND LAKE COMPLIANCE FILING 02/14/2022
    20222-182763-01 PUBLIC 22-10 PR CROW WING POWER REPORT--2021 DISTRIBUTED ENERGY RESOURCE INTERCONNECTION REPORT 02/14/2022
    20222-182773-01 PUBLIC 22-10 PR CLEARWATER-POLK ELECTRIC COOPERATIVE REPORT 02/14/2022
    20222-182684-01 PUBLIC 22-10 PR MOOSE LAKE WATER AND LIGHT COMMISSION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/11/2022
    20222-182694-01 PUBLIC 22-10 PR WESTBROOK PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/11/2022
    20222-182697-01 PUBLIC 22-10 PR BRAINERD PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/11/2022
    20222-182640-01 PUBLIC 22-10 PR RENVILLE SIBLEY COOPERATIVE POWER ASSN REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/10/2022
    20222-182649-01 PUBLIC 22-10 PR CITY OF CHASKA REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/10/2022
    20222-182655-01 PUBLIC 22-10 PR HALSTAD UTILITY REPORT--ANNUAL DISTRIBUTED GENERATION 02/10/2022
    20222-182661-01 PUBLIC 22-10 PR KANDIYOHI POWER COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/10/2022
    20222-182668-01 PUBLIC 22-10 PR LYON-LINCOLN ELECTRIC COOPERATIVE, INC. REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/10/2022
    20222-182598-01 PUBLIC 22-10 PR CITY OF TRUMAN REPORT--ANNUAL DISTRIBUTED GENERATION 02/09/2022
    20222-182632-01 PUBLIC 22-10 PR LAKE REGION ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/09/2022
    20222-182533-01 PUBLIC 22-10 PR CITY OF KASOTA REPORT--ANNUAL DISTRIBUTED GENERATION 02/08/2022
    20222-182543-01 PUBLIC 22-10 PR CITY OF ALVARADO REPORT--ANNUAL DISTRIBUTED GENERATION 02/08/2022
    20222-182547-01 PUBLIC 22-10 PR CITY OF DUNNELL REPORT--ANNUAL DISTRIBUTED GENERATION 02/08/2022
    20222-182550-01 PUBLIC 22-10 PR CITY OF BARNESVILLE MUNICIPAL UTILITY REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/08/2022
    20222-182563-01 PUBLIC 22-10 PR CITY OF STAPLES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/08/2022
    20222-182564-01 PUBLIC 22-10 PR JACKSON MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/08/2022
    20222-182567-01 PUBLIC 22-10 PR NASHWAUK PUBLIC UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 02/08/2022
    20222-182484-01 PUBLIC 22-10 PR ELBOW LAKE MUNICIPAL POWER REPORT--ANNUAL DISTRIBUTED GENERATION 02/07/2022
    20222-182497-01 PUBLIC 22-10 PR PRINCETON PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/07/2022
    20222-182503-01 PUBLIC 22-10 PR AITKIN PUBLIC UTILITIES COMMISSION REPORT--ANNUAL DISTRIBUTED GENERATION 02/07/2022
    20222-182508-01 PUBLIC 22-10 PR FREEBORN MOWER ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/07/2022
    20222-182414-01 PUBLIC 22-10 PR PUC NOTICE--NOTICE OF ANNUAL DER REPORTING DEADLINE FOR DOCKET 22-10 02/04/2022
    20222-182419-01 PUBLIC 22-10 PR REDWOOD FALLS PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/04/2022
    20222-182421-01 PUBLIC 22-10 PR NORTHWESTERN WISCONSIN ELECTRIC COMPANY REPORT--ANNUAL DISTRIBUTED GENERATION 02/04/2022
    20222-182423-01 PUBLIC 22-10 PR HUTCHINSON UTILITIES COMMISSION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/04/2022
    20222-182424-01 PUBLIC 22-10 PR DETROIT LAKES PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/04/2022
    20222-182459-01 PUBLIC 22-10 PR STEARNS ELECTRIC ASSOCIATION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/04/2022
    20222-182393-01 PUBLIC 22-10 PR WILD RICE ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/03/2022
    20222-182398-01 PUBLIC 22-10 PR AUSTIN UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/03/2022
    20222-182283-01 PUBLIC 22-10 PR JANESVILLE MUNICIPAL UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION 02/01/2022
    20222-182287-01 PUBLIC 22-10 PR ST. PETER MUNICIPAL UTILITIES REPORT--ANNUAL DER INTERCONNECTION REPORT 02/01/2022
    20222-182295-01 PUBLIC 22-10 PR MINNESOTA VALLEY COOP LIGHT AND POWER ASSOCIATION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/01/2022
    20222-182334-01 PUBLIC 22-10 PR ELK RIVER MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 02/01/2022
    20221-182206-01 PUBLIC 22-10 PR CITY OF WINTHROP REPORT--ANNUAL DISTRIBUTED GENERATION 01/31/2022
    20221-182132-01 PUBLIC 22-10 PR ITASCA-MANTRAP COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/28/2022
    20221-182053-01 PUBLIC 22-10 PR BENSON MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/27/2022
    20221-182038-01 PUBLIC 22-10 PR ALP COMPLIANCE FILING--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/26/2022
    20221-181939-01 PUBLIC 22-10 PR TODD-WADENA ELECTRIC COOPERATIVE REPORT--TODD-WADENA DER INTERCONNECTION REPORT 01/25/2022
    20221-181943-01 PUBLIC 22-10 PR NEW PRAGUE UTILITIES COMMISSION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/25/2022
    20221-181913-01 PUBLIC 22-10 PR NORTH STAR ELECTRIC COOPERATIVE, INC. REPORT--DER INTERCONNECTION REPORT 01/24/2022
    20221-181804-01 PUBLIC 22-10 PR MILLE LACS ENERGY COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/21/2022
    20221-181812-01 PUBLIC 22-10 PR FEDERATED RURAL ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/21/2022
    20221-181824-01 PUBLIC 22-10 PR SOUTH CENTRAL ELECTRIC ASSOCIATION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/21/2022
    20221-181825-01 PUBLIC 22-10 PR REDWOOD ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/21/2022
    20221-181696-01 PUBLIC 22-10 PR SPRING VALLEY PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/19/2022
    20221-181573-01 PUBLIC 22-10 PR BROWNTON MUNICIPAL LIGHT & POWER REPORT--ANNUAL DISTRIBUTED GENERATION REPORT 01/18/2022
    20221-181578-01 PUBLIC 22-10 PR AGRALITE ELECTRIC COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/18/2022
    20221-181586-01 PUBLIC 22-10 PR COOPERATIVE LIGHT & POWER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/18/2022
    20221-181590-01 PUBLIC 22-10 PR MCLEOD POWER COOPERATIVE REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/18/2022
    20221-181597-01 PUBLIC 22-10 PR NOBLES COOPERATIVE ELECTRIC REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/18/2022
    20221-181639-01 PUBLIC 22-10 PR GLENCOE LIGHT AND POWER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/18/2022
    20221-181551-01 PUBLIC 22-10 PR RUNESTONE ELECTRIC ASSOCIATION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/14/2022
    20221-181552-01 PUBLIC 22-10 PR GOODHUE COUNTY COOPERATIVE ELECTRIC ASSOCIATION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/14/2022
    20221-181471-01 PUBLIC 22-10 PR CITY OF OLIVIA REPORT--ANNUAL DISTRIBUTED GENERATION 01/13/2022
    20221-181475-01 PUBLIC 22-10 PR CITY OF RANDALL REPORT--ANNUAL DISTRIBUTED GENERATION 01/13/2022
    20221-181496-01 PUBLIC 22-10 PR RED RIVER VALLEY COOPERATIVE POWER ASSOCIATION REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/13/2022
    20221-181363-01 PUBLIC 22-10 PR MADELIA MUNICIPAL LIGHT & POWER REPORT--MADELIA DER INTERCONNECTION REPORT 01/11/2022
    20221-181365-01 PUBLIC 22-10 PR CITY OF BUHL REPORT--ANNUAL DISTRIBUTED GENERATION REPORT 01/11/2022
    20221-181367-01 PUBLIC 22-10 PR WINDOM MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/11/2022
    20221-181369-01 PUBLIC 22-10 PR DELANO MUNICIPAL UTILITY REPORT--DELANO DER INTERCONNECTION REPORT 01/11/2022
    20221-181370-01 PUBLIC 22-10 PR BLUE EARTH LIGHT AND WATER REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/11/2022
    20221-181381-01 PUBLIC 22-10 PR CITY OF ROSEAU REPORT--ANNUAL DISTRIBUTED GENERATION 01/11/2022
    20221-181390-01 PUBLIC 22-10 PR BENCO REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/11/2022
    20221-181337-01 PUBLIC 22-10 PR EAST GRAND FORKS WATER & LIGHT REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/10/2022
    20221-181340-01 PUBLIC 22-10 PR WELLS PUBLIC UTILITIES REPORT--ANNUAL DISTRIBUTED GENERATION INTERCONNECTIONS 01/10/2022
    20221-181344-01 PUBLIC 22-10 PR CITY OF CALEDONIA ELECTRIC DEPARTMENT REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/10/2022
    20221-181349-01 PUBLIC 22-10 PR NEW ULM PUBLIC UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/10/2022
    20221-181350-01 PUBLIC 22-10 PR LAKE CRYSTAL MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/10/2022
    20221-181353-01 PUBLIC 22-10 PR MORA MUNICIPAL UTILITIES REPORT--DISTRIBUTED ENERGY RESOURCE (DER) INTERCONNECTION REPORT 01/10/2022

    Showing 1 to 172 of 172 results

    Page of 1
     
    New Search           Modify Search          
     
    Minnesota Commerce: eFiling
    eFiling / eService is a joint project of the Minnesota Department of Commerce and Minnesota Public Utilities Commission
    Copyright 2009 by the Minnesota Department of Commerce and Minnesota Public Utilities Commission
    This site best viewed with a screen resolution of 1024X768 or greater.
    Version: main - 41728ef7
    Build Date: 2022-05-27 02:57
    State Of Minnesota | Get Acrobat Reader |