20164-120648-01
PUBLIC
15-10
PR
MEEKER COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
04/26/2016
20161-117667-01
PUBLIC
15-10
PR
LAKE COUNTRY POWER
REPORT--INTERCONNECTION REPORTING FOR 2015 YEAR (14-10 FORM)
01/26/2016
20156-111645-01
PUBLIC
15-10
PR
AGRALITE ELECTRIC COOPERATIVE
COMPLIANCE FILING--DISTRIBUTED GENERATION INTERCONNECTION REPORT
06/22/2015
20153-108513-01
PUBLIC
15-10
PR
MILLE LACS ENERGY COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/24/2015
20153-108454-01
PUBLIC
15-10
PR
CITY OF VIRGINIA, DEPARTMENT OF PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/23/2015
20153-108312-01
PUBLIC
15-10
PR
BRECKENRIDGE PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/17/2015
20153-108329-01
PUBLIC
15-10
PR
PEOPLE'S ENERGY COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/17/2015
20153-108181-01
PUBLIC
15-10
PR
WRIGHT-HENNEPIN COOPERATIVE ELECTRIC ASSN
COMPLIANCE FILING--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/13/2015
20153-108135-01
PUBLIC
15-10
PR
CITY OF WADENA
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/12/2015
20153-107910-01
PUBLIC
15-10
PR
CITY OF SAINT PETER MUNICIPAL UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
03/04/2015
20153-107910-02
PUBLIC
15-10
PR
CITY OF SAINT PETER MUNICIPAL UTILITIES
REPORT--COVER LETTER
03/04/2015
20153-107932-01
PUBLIC
15-10
PR
MINNESOTA VALLEY ELECTRIC COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
03/04/2015
20153-107884-01
PUBLIC
15-10
PR
NORTHWESTERN WISCONSIN ELECTRIC COMPANY
REPORT--DISTRIBUTED GENERATION REPORT
03/03/2015
20152-107792-01
PUBLIC
15-10
PR
RENVILLE-SIBLEY COOPERATIVE POWER ASSOCIATION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/02/2015
20153-107795-01
PUBLIC
15-10
PR
NORTH STAR ELECTRIC COOPERATIVE, INC.
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/02/2015
20153-107830-01
PUBLIC
15-10
PR
MINNESOTA POWER
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
03/02/2015
20153-107830-02
TRADE SECRET
15-10
PR
MINNESOTA POWER
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
03/02/2015
20153-107830-03
PUBLIC
15-10
PR
MINNESOTA POWER
REPORT--COVER LTR -DG INTERCONNT. RPT
03/02/2015
20153-107838-01
PUBLIC
15-10
PR
ALP UTILITIES (FORMERLY ALEXANDRIA LIGHT AND POWER)
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
03/02/2015
20153-107839-01
PUBLIC
15-10
PR
REDWOOD ELECTRIC COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/02/2015
20153-107849-01
PUBLIC
15-10
PR
OWATONNA PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/02/2015
20153-107857-02
TRADE SECRET
15-10
PR
XCEL ENERGY
REPORT--COVER LETTER
03/02/2015
20153-107857-04
PUBLIC
15-10
PR
XCEL ENERGY
REPORT--COVER LETTER
03/02/2015
20153-107857-06
TRADE SECRET
15-10
PR
XCEL ENERGY
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/02/2015
20153-107857-08
PUBLIC
15-10
PR
XCEL ENERGY
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
03/02/2015
260345
PUBLIC
15-10
PR
BELTRAMI ELECTRIC COOPERATIVE, INC.
OTHER--COGENERATION AND SMALL POWER PRODUCTION TARIFF
02/28/2015
20152-107741-01
PUBLIC
15-10
PR
COOPERATIVE LIGHT & POWER ASSOCIATION OF LAKE COUNTY
REPORT--DIST. GEN. INTERCONNECTION REPORT
02/27/2015
20152-107744-01
PUBLIC
15-10
PR
COOPERATIVE LIGHT & POWER ASSOCIATION OF LAKE COUNTY
REPORT--CORRECTED - DIST. GEN. INTERCONNECTION REPORT
02/27/2015
20152-107756-01
PUBLIC
15-10
PR
NEW ULM PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/27/2015
20152-107681-01
PUBLIC
15-10
PR
CITY OF ANOKA
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/26/2015
20152-107688-01
PUBLIC
15-10
PR
WELLS PUBLIC UTLITIES
REPORT--SCHEDULE C
02/26/2015
20152-107688-02
PUBLIC
15-10
PR
WELLS PUBLIC UTLITIES
REPORT--COVER LETTER
02/26/2015
20152-107688-03
PUBLIC
15-10
PR
WELLS PUBLIC UTLITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT - ON 14-10 FORM
02/26/2015
20152-107688-04
PUBLIC
15-10
PR
WELLS PUBLIC UTLITIES
REPORT--SCHEDULE A, B, G
02/26/2015
20152-107691-01
PUBLIC
15-10
PR
CITY OF REDWOOD FALLS/PUBLIC UTILITIES
REPORT--COVER LETTER
02/26/2015
20152-107691-02
PUBLIC
15-10
PR
CITY OF REDWOOD FALLS/PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/26/2015
20152-107729-01
PUBLIC
15-10
PR
SAUK CENTRE PUBLIC UTILITIES COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/26/2015
20152-107643-01
PUBLIC
15-10
PR
BELTRAMI ELECTRIC COOPERATIVE, INC.
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/25/2015
20152-107646-01
PUBLIC
15-10
PR
WASECA UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/25/2015
20152-107658-01
PUBLIC
15-10
PR
LITCHFIELD PUBLIC UTILITIES
REPORT--COVER LETTER
02/25/2015
20152-107658-02
PUBLIC
15-10
PR
LITCHFIELD PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/25/2015
20152-107660-01
PUBLIC
15-10
PR
LAKE CITY PUBLIC UTILITIES
REPORT--COVER LETTER
02/25/2015
20152-107660-02
PUBLIC
15-10
PR
LAKE CITY PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/25/2015
20152-107660-03
PUBLIC
15-10
PR
LAKE CITY PUBLIC UTILITIES
REPORT--SCHEDULES
02/25/2015
20152-107596-01
PUBLIC
15-10
PR
MINNESOTA VALLEY COOPERATIVE LIGHT & POWER ASSOCIATION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/24/2015
20152-107600-01
PUBLIC
15-10
PR
FAIRMONT PUBLIC UTILITIES COMMISSION
REPORT--FAIRMONT PUBLIC UTILITY COMMISSION ANNUAL DISTRIBUTED GENERATION INTERCONNECT REPORT
02/24/2015
20152-107600-02
PUBLIC
15-10
PR
FAIRMONT PUBLIC UTILITIES COMMISSION
REPORT--FAIRMONT PUBLIC UTILITY COMMISSION ANNUAL DISTRIBUTED GENERATION INTERCONNECT REPORT 15-10
02/24/2015
20152-107606-01
PUBLIC
15-10
PR
SOUTH CENTRAL ELECTRIC ASSOCIATION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/24/2015
20152-107607-01
PUBLIC
15-10
PR
PRESTON PUBLIC UTILITIES
REPORT--COVER LETTER
02/24/2015
20152-107607-02
PUBLIC
15-10
PR
PRESTON PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/24/2015
20152-107620-01
PUBLIC
15-10
PR
WESTBROOK PUBLIC UTILITIES
COMPLIANCE FILING--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/24/2015
20152-107626-01
PUBLIC
15-10
PR
LAKE REGION ELECTRIC COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/24/2015
20152-107628-01
PUBLIC
15-10
PR
MCLEOD COOPERATIVE POWER ASSOCIATION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/24/2015
20152-107631-01
PUBLIC
15-10
PR
EAST CENTRAL ENERGY
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/24/2015
20152-107550-01
PUBLIC
15-10
PR
AUSTIN UTILITIES
LETTER--ANNUAL QUALIFYING FACILITIES
02/23/2015
20152-107551-01
PUBLIC
15-10
PR
AUSTIN UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/23/2015
20152-107558-01
PUBLIC
15-10
PR
CITY OF LUVERNE
REPORT--DIST. GEN. INTERCONNECTION REPORT
02/23/2015
20152-107561-01
PUBLIC
15-10
PR
MARSHALL MUNICIPAL UTILITIES
LETTER--ANNUAL DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/23/2015
20152-107572-01
PUBLIC
15-10
PR
BLOOMING PRAIRIE UTILITIES COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT PART 1 OF 3
02/23/2015
20152-107572-02
PUBLIC
15-10
PR
BLOOMING PRAIRIE UTILITIES COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT PART 2 OF 3
02/23/2015
20152-107572-03
PUBLIC
15-10
PR
BLOOMING PRAIRIE UTILITIES COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT PART 3 OF 3
02/23/2015
20152-107577-01
PUBLIC
15-10
PR
BRAINERD PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/23/2015
20152-107579-01
PUBLIC
15-10
PR
SIOUX VALLEY ENERGY
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/23/2015
20152-107581-01
PUBLIC
15-10
PR
MELROSE PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION LETTER
02/23/2015
20152-107581-02
PUBLIC
15-10
PR
MELROSE PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/23/2015
20152-107584-01
PUBLIC
15-10
PR
NEW PRAGUE UTILITIES COMMISSION
REPORT--NEW PRAGUE SCHEDULE C CALCULATION (15-10 ONLY - NOT 15-9)
02/23/2015
20152-107584-02
PUBLIC
15-10
PR
NEW PRAGUE UTILITIES COMMISSION
REPORT--SCHEDULE ABG (15-10 ONLY - NOT 15-9)
02/23/2015
20152-107584-03
PUBLIC
15-10
PR
NEW PRAGUE UTILITIES COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT (15-10 ONLY - NOT 15-9)
02/23/2015
20152-107584-04
PUBLIC
15-10
PR
NEW PRAGUE UTILITIES COMMISSION
REPORT--COVER LETTER (15-10 ONLY - NOT 15-9)
02/23/2015
20152-107588-01
PUBLIC
15-10
PR
CITY OF FAIRFAX
REPORT
02/23/2015
20152-107499-01
PUBLIC
15-10
PR
SPRING VALLEY UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/20/2015
20152-107507-01
PUBLIC
15-10
PR
STEELE-WASECA COOPERATIVE ELECTRIC
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/20/2015
20152-107526-01
PUBLIC
15-10
PR
SPRING VALLEY UTILITIES
COMPLIANCE FILING
02/20/2015
20152-107457-01
PUBLIC
15-10
PR
RED RIVER VALLEY COOPERATIVE POWER ASSOCIATION
LETTER--DISTRIBUTED GENERATION INTERCONNECTION
02/19/2015
20152-107485-01
PUBLIC
15-10
PR
GOODHUE COUNTY COOPERATIVE ELECTRIC
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/19/2015
20152-107416-01
PUBLIC
15-10
PR
FREEBORN-MOWER COOPERATIVE SERVICES
REPORT--2014 DISTRIBUTED GENERATION INTERCONNECTION
02/18/2015
20152-107422-01
PUBLIC
15-10
PR
NOBLES COOPERATIVE ELECTRIC
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/18/2015
20152-107425-01
PUBLIC
15-10
PR
CITY OF BARNESVILLE MUNICIPAL UTILITY
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/18/2015
20152-107439-01
PUBLIC
15-10
PR
PRINCETON PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/18/2015
20152-107439-02
PUBLIC
15-10
PR
PRINCETON PUBLIC UTILITIES
REPORT--SCHEDULES A,B,C,
02/18/2015
20152-107353-01
PUBLIC
15-10
PR
RED LAKE ELECTRIC COOPERATIVE, INC.
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/17/2015
20152-107378-01
PUBLIC
15-10
PR
TRI-COUNTY ELECTRIC COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/17/2015
20152-107311-01
PUBLIC
15-10
PR
DAKOTA ELECTRIC ASSOCIATION
REPORT--DISTRIBUTED GENERATION INTERCONECTION
02/13/2015
20152-107320-01
PUBLIC
15-10
PR
STEARNS ELECTRIC ASSOCIATION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/13/2015
20152-107336-02
PUBLIC
15-10
PR
GRAND MARAIS PUBLIC UTILITIES COMMISSION
REPORT--LETTER
02/13/2015
20152-107336-04
PUBLIC
15-10
PR
GRAND MARAIS PUBLIC UTILITIES COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/13/2015
20152-107349-02
PUBLIC
15-10
PR
BROWN COUNTY RURAL ELECTRICAL ASSOCIATION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/13/2015
20152-107349-04
PUBLIC
15-10
PR
BROWN COUNTY RURAL ELECTRICAL ASSOCIATION
REPORT--QUALIFYING FACILITIES REPORT
02/13/2015
20152-107226-01
PUBLIC
15-10
PR
HUTCHINSON UTILITIES COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/11/2015
20152-107257-01
PUBLIC
15-10
PR
CITY OF BUFFALO MUNICIPAL ELECTRIC
COMPLIANCE FILING--QUALIFYING FACILITIES REPORT FOR 10/01/12 THROUGH 012/31/14
02/11/2015
20152-107188-01
PUBLIC
15-10
PR
GLENCOE LIGHT AND POWER COMMISSION
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/10/2015
20152-107191-01
PUBLIC
15-10
PR
MOUNTAIN LAKE UTILLITES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/10/2015
20152-107195-01
PUBLIC
15-10
PR
CITY OF ST.JAMES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/10/2015
20152-107201-01
PUBLIC
15-10
PR
CITY OF HENNING
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/10/2015
20152-107202-01
PUBLIC
15-10
PR
CROW WING POWER
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/10/2015
20152-107206-01
PUBLIC
15-10
PR
ITASCA-MANTRAP ELECTRIC COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/10/2015
20152-107130-01
PUBLIC
15-10
PR
DETROIT LAKES PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/09/2015
20152-107134-01
PUBLIC
15-10
PR
CITY OF STEPHEN
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/09/2015
20152-107135-01
PUBLIC
15-10
PR
LYON-LINCOLN ELECTRIC COOPERATIVE, INC.
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/09/2015
20152-107151-01
PUBLIC
15-10
PR
ADRIAN PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/09/2015
20152-107087-01
PUBLIC
15-10
PR
BENCO ELECTRIC COOPERATIVE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/06/2015
20152-107111-01
PUBLIC
15-10
PR
ELBOW LAKE MUNICIPAL POWER
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/06/2015
20152-107114-01
PUBLIC
15-10
PR
MOORHEAD PUBLIC SERVICE
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
02/06/2015
20152-107066-01
PUBLIC
15-10
PR
ROCHESTER PUBLIC UTILITIES
COMPLIANCE FILING--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/05/2015
20152-107045-01
PUBLIC
15-10
PR
MADISON MUNICIPAL UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/04/2015
20152-106983-01
PUBLIC
15-10
PR
INTERSTATE POWER AND LIGHT COMPANY
REPORT--2014 DISTRIBUTED GENERATION INTERCONNECTION REPORT
02/03/2015
20151-106884-01
PUBLIC
15-10
PR
LANESBORO PUBLIC UTILITIES
REPORT--DISTRIBUTED GENERATION INTERCONNECTION
01/30/2015
20151-106890-01
TRADE SECRET
15-10
PR
OTTER TAIL POWER COMPANY
COMPLIANCE FILING--ANNUAL DISTRIBUTED GENERATION UPDATE
01/30/2015
20151-106890-02
PUBLIC
15-10
PR
OTTER TAIL POWER COMPANY
COMPLIANCE FILING--ANNUAL DISTRIBUTED GENERATION UPDATE
01/30/2015
20151-106752-01
PUBLIC
15-10
PR
OTTER TAIL POWER COMPANY
REPORT--2014 DISTRIBUTED GENERATION INTERCONNECTION REPORT
01/28/2015
20151-106652-01
PUBLIC
15-10
PR
BENSON MUNICIPAL ELECTRIC UTILITY
REPORT--2014 ANNUAL DISTRIBUTED GENERATION INTERCONNECTION REPORT
01/26/2015